Progress
2017-09-28 HMI based on Node-Red
Starting to test miniature LOMAS with easy user interface
2017-09-27 LOMAS gets its own laboratory
The miniature LOMAS is alive and some parts of the code is starting to be tested.
2017-09-14 BOM list is done
BOM list is done and time to order parts for full size prototype
2017-09-12 Assembly of miniature LOMAS is almost done
The miniature LOMAS is alive and some parts of the code is starting to be tested.